Cisco GRP= Installation And Configuration Note page 17

Gigabit route processor
Table of Contents

Advertisement

Place the removed GRP on an antistatic mat or foam. If you plan to return the GRP to the factory,
Step 7
immediately place it in an antistatic bag to prevent ESD damage.
Installing a GRP
When you install a GRP, be sure to use the ejector levers, which help to ensure that the GRP is fully
inserted in the backplane connector. (See
inward (toward the center of the GRP), the ejector levers push the GRP into the slot and ensure that the
GRP backplane connector is fully seated in the backplane.
A GRP that is only partially connected to the backplane can halt the system.
Caution
Use the following procedure to install a GRP:
Use an ESD-preventive wrist or ankle strap and follow its instructions for use.
Step 1
Grasp the GRP faceplate with one hand and place your other hand under the carrier to support and
Step 2
guide it into an upper card cage slot. (See
Avoid touching the GRP printed circuit board, components, or any edge connector pins.
Caution
Place the bus-connector edge of the GRP in the appropriate slot and align the notches along the edge of
Step 3
the carrier with the grooves at the top and bottom of the slot.
While keeping the GRP edge connector parallel to the backplane, carefully slide the carrier into the slot
Step 4
until the GRP faceplate makes contact with the ejector levers, then stop.
Using the thumb and forefinger of each hand to pinch each ejector lever, simultaneously push both
Step 5
ejectors toward the center of the GRP faceplate until they are perpendicular to the GRP faceplate.
(See
Using a 3/16-inch flat-blade screwdriver, tighten the captive screws on the ends of the GRP. The captive
Step 6
screws prevent the GRP from becoming partially dislodged from the backplane and ensure proper EMI
shielding. (These captive screws must be tightened to meet EMI specifications.)
If you disconnected the console terminal to remove the GRP, or if you are installing a new GRP,
Step 7
connect the console terminal to the console port. (See the
page
Ensure that the console terminal is turned on.
Step 8
Turn on system power.
Step 9
Attach the network end of your RJ-45 or MII cable to your transceiver, switch, hub, repeater, DTE, or
Step 10
other external equipment. Be sure to use the appropriate strain relief on cable connections.
78-4339-09
Figure
4a.)
18.)
Figure
3.) When you simultaneously push the ejector levers
Figure
4.)
"Connecting to the Console Port" section on
Replacing a GRP
Installing a GRP
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Grp-b=

Table of Contents