4.
Check that all fi lters are installed in the fi lter box, located on the back of
the unit. If the Active carbon fi lter is not installed, place the active carbon
fi lter found on the packaging in the order shown in Figure 1.
•
Filter grid
•
Air fi lter
•
Active carbon fi lter
5.
Before the initial operation, please check, if the
water level switch, located within the water bucket
area, is in the right position. In case that the water
level switch is not in the right position the TANK
FULL sensor will not operate.
For installation of the unit in operation of Continuous water
drainage, please see below point Continuous water drainage
Fig. 1
6
ENGLISH
Water level switch
.