CAME FROG Series Installation Manual page 7

Automation system for swing gates
Hide thumbs Also See for FROG Series:
Table of Contents

Advertisement

- Lubricate the pinion of the foundation box, the sleeve bearing, the arm assembly and the upper arm assembly. Follow the
diagrams to assemble properly.
Arm assembly
Upper arm assembly
Sleeve bearing
Pinion
- Place the gate leaf above the upper arm assembly making sure that the hinge is secured properly.
Properly weld the gate leaf to the upper arm assembly.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superfrog

Table of Contents