Power-Up And Initialization; Failed Self-Test - ADTRAN ATLAS 550 User Manual

Imux-56/64 module
Hide thumbs Also See for ATLAS 550:
Table of Contents

Advertisement

POWER-UP AND INITIALIZATION

FAILED SELF-TEST

61200326L1-1
After installing the IMUX-56/64 Module into the ATLAS 550 chassis, the
front panel S
indicator blinks red, yellow, and green for a time. The
TATUS
indicator remains solid green when the IMUX-56/64 Module is
S
TATUS
ready to use. At this time, you can invoke a system self-test; refer to the AT-
LAS 550 User Manual for details.
This self-test sequence may take up to eleven (11) minutes.
The terminal menu self-test log records any self-test failures for the IMUX-
56/64 module. Resources that fail self-test are disabled after power-up ini-
tialization is complete. Performing a hardware-level reset via the terminal
menu may recover these failed resources.
IMUX-56/64 Module User Manual
Chapter 2. Installation
2-3

Advertisement

Table of Contents
loading

Table of Contents