Verifying the Switch Settings on the System
Controller CPU Board
Verify all switch positions are set as follows prior to rebooting the system
controller CPU board.
1. Ensure the system management controller (SMC) switches (SW0501-1 and
SW0501-2) are in the down (off) position.
2. Ensure power module configuration (PS) switches 1 and 4 are in the up
(on) position, and PS 2, 3, 5, and 6 are in the down (off) position.
3. Ensure the SW1801 and SW2401 switches are in the up position.
Completing the Installation
To complete the installation procedure, refer to the following sections of the
system service manual for your system:
"Installing the System Controller CPU Board"
"Installing the System Control (SC) Board"
"Verifying the Memory Boards on the System Controller CPU"
1
SV2
SV4
1
2
8F
1
2
3
4
9J
SV2
1
2
8F
SW2401
SV4
2
3
4
9J
SW1801
SV2
1
2
8F
SW0501
SV2
1
2
8F
PS
ON
1
3
1 2 3 4 5 6