Operation; Reading And Setting Parameters - DAB ESYBOX DIVER Instruction For Installation And Maintenance

Table of Contents

Advertisement

4)
Put DCONNECT BOX 2 in the association
phase
a.
b.
6)
Check the PLC led status on DCONNECT BOX 2. When it remains on with a steady light, the association has been
successful. At this point, your ESYBOX DIVER will also be present in the installation menu, and you can access the current
status and configurations.
NOTE 1: The DConnect Cloud remote control service requires registration with the portal and, after a trial period, it requires a subscription. All
information is available on the site: www.internetofpumps.com
NOTE 2: This manual refers to DConnect APP menus, colours or descriptions may change.
To get the best out of the product and its interaction with the APP and the DConnect Cloud service, consult also the online documentation and
watch the demonstration videos. All the necessary information is available on the site: www.internetofpumps.com or www.dabpumps.com
6

OPERATION

Once the electropump is primed, the system starts regular operation according to the configured parameters: it starts automatically when the tap
is turned on, supplies water at the set pressure (SP), and keeps the pressure constant even when other taps are turned on. When the water
consumption ends, the pump stops automatically after the time T2 has elapsed.
7

READING AND SETTING PARAMETERS

Using the app you can check the operating status of the pump and change the settings. Below is the list of parameters.
7.1
Status
Displays the pump status.
7.2
VP: Pressure display
Pressure measured on the system.
7.3
VF: Flow display
Displays the instantaneous flow.
7.4
RS: Rotation speed display
Motor rotation speed in rpm.
7.5
PO: absorbed power
Power absorbed by the power supply line.
Press "Connect a new product"
Select Esybox Diver
ENGLISH
5)
24
Within 20 sec connect ESYBOX DIVER
to the mains and follow the procedure
required in the APP.

Advertisement

Table of Contents
loading

Table of Contents