Verifying Installation Of Supervisor, Switching, And Services Modules - Cisco MDS 9500 Series Hardware Installation Manual

Cisco systems network device installation guide
Hide thumbs Also See for MDS 9500 Series:
Table of Contents

Advertisement

Removing, Installing, and Verifying Supervisor, Switching, and Services Modules
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m
Step 5
If a filler panel is installed, remove the two Phillips pan-head screws from the filler panel and remove
the panel. To remove a currently installed module, see the
Modules" section on page
Open both the ejector levers on the new or replacement module completely. (See
Step 6
Position the module in the chassis as follows:
Step 7
a.
b.
c.
Caution
d.
Note
e.
If you replaced the standby supervisor module in a switch that has two supervisors and is running Cisco
Step 8
MDS SAN-OS Release 1.2(2a) or earlier, enable the automatic synchronization feature, which is
disabled by default.
Step 9
If you replaced the supervisor in a switch that does not have a second supervisor or is running Cisco
MDS SAN-OS Release 1.3(1) or later or NX-OS Release 4.1(1b), download the configuration from the
server to the nonvolatile memory of the supervisor. For more information, see the Cisco MDS 9000
Family NX-OS Fundamentals Configuration Guide.

Verifying Installation of Supervisor, Switching, and Services Modules

To verify the module installation, follow these steps:
Step 1
Verify that the ejector levers of each module are fully closed (parallel to the front of the module) to
ensure that the supervisor module and all switching or services modules are fully seated in the backplane
connectors.
Check the captive screws of each module, the power supply, and the fan module. Tighten any loose
Step 2
captive screws to 8 in-lb.
Step 3
Verify that any empty module slots have filler panels installed and that the screws holding the panels in
place are tight.
Cisco MDS 9500 Series Hardware Installation Guide
2-46
2-45.
Position the module in the slot. Ensure that you align the sides of the module carrier with the slot
guides on each side of the slot.
Slide the module carefully into the slot until the EMI gasket along the top edge of the module
contacts the module in the slot above it and both ejector levers close to approximately 45 degrees
with respect to the front of the module. (See
Grasp the two ejector levers using the thumb and forefinger of each hand, and press down to create
a small 0.040-inch (1-mm) gap between the module's EMI gasket and the module above it. (See
Figure
2-24.)
Do not press down too forcefully on the levers because they can bend.
While pressing down, simultaneously close the left and right ejector levers to fully seat the
supervisor module or switching module in the backplane connector. The ejector levers are fully
closed when they are flush with the front of the module.
Ensure the ejector levers are fully closed before tightening the captive screws. Failure to fully
seat the module in the backplane connector can result in error messages.
Tighten the two captive screws on the supervisor module or switching module to 8 in-lb.
Chapter 2
Installing the Cisco MDS 9500 Series
"Removing Other Switching and Services
Figure
2-23.)
Figure
2-22.)
OL-19587-01

Advertisement

Table of Contents
loading

Table of Contents