Mounting Procedure - Omron F3SJ-A P Series User Manual

Hide thumbs Also See for F3SJ-A P Series:
Table of Contents

Advertisement

Wiring/Installation

Mounting Procedure

1.
Attach the top/bottom mounting bracket (1) to a wall or pillar.
2.
Place the top/bottom mounting bracket (2) in the screw hole at
the top or bottom of the F3SJ, and tighten it with an included
screw (M5x18).
3.
Use the top/bottom mounting bracket (3) and (1) to hold the top
of the F3SJ, and fasten them lightly with the included screws
(M3x8).
4.
Perform the same step for the bottom of the F3SJ and hand
tighten.
5.
Turn the F3SJ right and left to align it to a center position where
the 5 lamps of the incident light level indicator are turned ON.
6.
Fasten the screws tightly.
7.
Mounting is complete.
If intermediate brackets are required, proceed to steps 8 to 13.
Tel : 03.26.04.20.21 - Fax : 03.26.04.28.20 - Web : http: www.audin.fr - Email : info@audin.fr
F3SJ-A
76
User's Manual
AUDIN - 8, avenue de la malle - 51370 Saint Brice Courcelles

Advertisement

Table of Contents
loading

Table of Contents