2 Planning Installation
2.1 Overview
This section includes flow charts to guide you through the planning process for a successful installation of
the HP Toptools solution with specific focus on the HP Toptools device manager.
Key areas for planning:
Resource Allocation (both human and hardware)
Testing
Down time (possible reboots)
Installation of the device manager and deployment of agents
Maintenance (application of Service Packs)
Training
2.2 Planning flowchart
Installation
plan complete
HP Toptools Deployment Guide Version 5.5
HP Toptools
Setup SNMP Services
(Reboot optional)
Run setup from the
HP Toptools CD
Check the needed device
components in the dialog
box during the HP Toptools
device manager
installationn
Check the needed
integration components in
the dialog boxes during the
HP Toptools device
manager installationn
Continue
device manager
installation
7
To save time when
installing on Windows NT,
wait to reboot until after
applying the Service Pack
hubs and switches
netserver components
desktop PC's
Web JetAdmin for printers
Servicecontrol manager
Web JetAdmin
configuration
Need help?
Do you have a question about the Vectra E-Vectra and is the answer not in the manual?
Questions and answers