Page 1
2200 Series Version 2 Precision Move Conveyors Installation, Maintenance & Parts Manual DORNER MFG. CORP. INSIDE THE USA OUTSIDE THE USA P.O. Box 20 • 975 Cottonwood Ave. TEL: 1-800-397-8664 TEL: 262-367-7600 Hartland, WI 53029-0020 USA FAX: 1-800-369-2440 FAX: 262-367-5827 For other service manuals visit our website at: www.dorner.com/service_manuals.asp...
• Inspect packages for shipping damage. Contact carrier Dorner reserves the right to make changes at any time regarding damage. without notice or obligation. • Accessories may be shipped loose. See accessory instruc- tions for installation.
SUPPORT CONVEYOR SECTIONS PRIOR TO LOOSENING STAND HEIGHT OR ANGLE ADJUSTMENT SCREWS. Conveyors are not reversible. Reversing creates pinch points which can cause severe injury. DO NOT REVERSE CONVEYORS. 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
Support Stand Drive End Idler/Tension End Gearmotor Mounting Package Gearmotor Center Drive Box (Center Drive Units) End Drive Conveyor Figure 1 Figure 2 Center Drive Conveyor Figure 2 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
Cleat Spacing support at joint. Belt Type Cleat Type Figure 3 Profiles Shaft Position Return Roller / Mounting Brackets Conveyor Length Conveyor Width Document Language Figure 3 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
• Steel cord belt maximum load = 200 lb all widths * See Ordering and Specifications Catalog for details. LLLL: • Minimum = 0150 = 1.5 feet (18") • Maximum = 3000 = 30 feet (360") 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
“Service Parts” section for details) Conveyors Up to 12 ft (3658 mm) No assembly is required. Install mounting brackets and return rollers. Refer to “2200 Series Mounting Brackets” on Figure 7 page 9 and “Return Rollers” on page 10. 2200 Series Version 2 Precision Move Conveyors Dorner Mfg.
“Conveyor Belt Tensioning” on page 20”. Figure 9 Figure 9 Install mounting brackets and return rollers. Refer to “2200 Series Mounting Brackets” on page 9 and Figure 11 “Return Rollers” on page 10. 2200 Series Version 2 Precision Move Conveyors 851-817 Rev.
(Figure 24, item 2). Tighten screws enough to secure cover. Figure 25 Figure 24 Figure 24 17. Install conveyor belt. See “Conveyor Belt Replacement” section on page 17. 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
Page 13
Tighten clamp screws (Figure 27, item 3) to 17 in-lb (2 Nm) to secure outer portion position of 3-jaw coupler. Install 3-jaw spider (Figure 27, item 4) into each end of outer portion of 3-jaw coupling. 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
• Impacted dirt on drive pulley • Intermittent jamming or drive train problems Cleaning Use Dorner Belt Cleaner. Mild soap and water may also be used. Do not soak the belt. 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A...
Place an additional support stand under the drive motor (Figure 44, item 2), if equipped. See WARNING. Figure 44 Figure 46 Figure 44 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
Orient belt so splice leading fingers (Figure 50, item 1) point in the direction of belt travel as identified by the conveyor directional label (Figure 50, item 2). 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
To replace the drive tail pulley, reverse the removal procedure. Re-install belt on end of conveyor, then tension the belt. See “Conveyor Belt Tensioning” on page 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
To replace the idler tail pulley, reverse the removal procedure. Re-install belt on end of conveyor. Tension the belt by reversing the steps in “Belt Removal for 1" Tip Up” on page Figure 63 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
If not, damage to bearing or shaft could result. Keep hands and fingers away from press and components during procedure. Figure 69 Figure 66 Figure 69 Repeat steps 1 through 4 for each bearing. 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
Figure 77 CARE. Figure 75 Figure 75 Using a utility knife (Figure 75, item 2), cut out notch in each corner (Figure 75, item 3). Figure 77 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
Page 27
(Figure 79, item 1). Be certain both pulleys are flush with shaft and tighten set screws (Figure 80, item 1) onto pulleys. Figure 80 Figure 83 Figure 80 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
93, item 1) or long bolt to knock out slug (Figure 94, item 1) for shaft backing up tail plate with washer. Figure 93 Figure 95 Figure 96 Figure 93 Figure 96 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
Figure 98 Figure 101 Insert pinion assembly (Figure 102, item 1) into conveyor frame. Figure 98 Figure 102 Replace worn components. Figure 99 Figure 102 Figure 99 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
Page 32
Make sure the bent end (Figure 106, item 1) of the gear rack is NOT assembled into the conveyor frame. Figure 103 Figure 106 Figure 104 Figure 106 Figure 104 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
Page 33
See “Conveyor Belt Tensioning” on page The gear racks must be aligned with each other, as shown above. Example of misaligned gear racks shown below. Figure 108 Figure 108 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
Service Parts NOTE For replacement parts other than those shown in this section, contact an authorized Dorner Service Center or the factory. Key Service Parts and Kits are identified by the Performance Parts Kits logo . Dorner recommends keeping these parts on hand.
Length Example: Length = 35.25" LLLLL = 03525 202498-LLLLL Tie Tube 242526-LLLLL Guard 920512M Socket Head Screw, M5-.80 x 12 mm 920695M Low Head Cap Screw, M6-1.00 x 25 mm 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
LLLLL = part length in inches with 2 decimal places M6-1.00 x 16 mm Length Example: Length = 35.25" LLLLL = 03525 9206150M Socket Head Screw, M6-1.00 x 150 mm 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
LLLLL = part length in inches with 2 decimal places 206397 Clip Length Example: Length = 35.25" LLLLL = 03525 920516M Socket Head Screw, M5-.80 x 16 mm 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
M6-1.00 x 150 mm 207155 Knob, 18 mm LLLLL = part length in inches with 2 decimal places 990601M Hex Nut Length Example: Length = 35.25" LLLLL = 03525 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
240836 Cleated Mount Assembly 950616M Low Head Cap Screw M6x16 mm 300150MK4 Drop−In Tee Bar (x4) 240838 Cleated Stand Mount Assembly 605279P Washer 807−920 Square Nut M6 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
Low Head Cap Screw M6 x 16 mm 2’ (610mm) Conveyor 240851 Cleated Belt Stand Mount Assembly 605279P Washer for 2’ (610mm) Conveyors 639971MK10 Drop−In Tee Bar (x10) 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
Connecting Assembly without Stand Mount Item Part Number Description Item Part Number Description 920614M Socket Head Screw, M6-1.00 x 14 mm 206520 Connecting Bar 206519 Connecting Assembly 240859 Plate 2200 Series Version 2 Precision Move Conveyors Dorner Mfg. Corp. 851-817 Rev. A...
Socket Head Screw, M6-1.00 x 14 mm 206520 Connecting Bar 920620M Socket Head Screw, M6-1.00 x 20 mm 240836 Cleated Stand Mount Assembly 240929 Connecting Assembly 605279P Washer 807-920 Square Nut M6 2200 Series Version 2 Precision Move Conveyors 851-817 Rev. A Dorner Mfg. Corp.
Figure 110 Flat Belt Part Number Configuration Cleated Belt Part Number Configuration Refer to Dorner patent plate (Figure 110). From the model Refer to Dorner patent plate (Figure 110). From the model number, determine conveyor width (“WW”), length number, width (“WW”), length (“LLLL”), cleat type (“C”) (“LLLL”) and belt type (“BB”).
RMA will automatically close 30 days after being issued. To get credit, items must be new and undamaged. There will be a return charge on all items returned for credit, where Dorner was not at fault. It is the customer’s responsibility to prevent damage during return shipping.
Need help?
Do you have a question about the 2200 Series and is the answer not in the manual?
Questions and answers