No. 5,174,435, 5,131,529 and corresponding patents out guards. and patent applications in other countries. Dorner reserves the right to make changes at any time Upon receipt of shipment: without notice or obligation. D Compare shipment with packing slip. Contact facto- ry regarding discrepancies.
Insert slide bars (A of Figure 3) into 2100 frame. On head plate for desired output shaft side, insert bearing (H of Figure 4) into slot (I). Figure 6 2200 Retro Fit Tails for 2100 Conveyors Dorner Mfg. Corp. 851-461 Rev. A...
Page 5
Installation NOTE: Press on inner race (J of Figure 7) of bear- ing only. Use Dorner tool part number 450282 or equivalent to aide in press fit. Figure 9 10. Twist bearing to fit into bearing enclosure. Figure 7 With bearing installed in head plate, use a bearing installation tool, (K of Figure 8), part number 450292, to press the bearing onto the drive shaft.
Page 6
(N of Figures 12 and 13) to 60 in–lbs (7 Nm). Figure 15 17. Install, tension, and track conveyor belt, refer to manual 851–452, “2200 Series End Drive Con- Figure 12 veyors.” Figure 13 14.
Insert slide bars (T of Figure 16) into 2100 frame. On both head plates, insert bearings (R of Figure 17) into slot (X). Twist bearing to fit into bearing enclosure. 2200 Retro Fit Tails for 2100 Conveyors Dorner Mfg. Corp. 851-461 Rev. A...
Page 8
21) to 35 in-lbs (4 Nm). Steady pulley with second Install, tension and track conveyor belt, refer to hex-key wrench (AB) inserted into pulley hole (Z manual 851–452, “2200 Series End Drive Con- of Figure 18). veyors.” 2200 Retro Fit Tails for 2100 Conveyors Dorner Mfg.
Page 9
Preventive Maintenance and Adjustment Refer to “2200 Series End Drive Conveyor” Setup, Operation and Maintenance manual, part number 851–452. Service Parts Refer to “2200 Series End Drive Conveyor” Setup, Operation and Maintenance manual, part number 851–452. 2200 Retro Fit Tails for 2100 Conveyors Dorner Mfg.
Page 10
Authorization Number to reference. There will be a 15% restocking charge on all new items returned for credit where Dorner was not at fault. These will not be accepted after 60 days from original invoice date. The restocking charge covers inspection, cleaning, disassembly, and reissuing to inventory.
Need help?
Do you have a question about the 2200 and is the answer not in the manual?
Questions and answers