Ppp Connection Termination - Quectel EC200U Series Application Note

Hide thumbs Also See for EC200U Series:
Table of Contents

Advertisement

5

PPP Connection Termination

There are two methods to terminate the PPP dial-up connection:
1.
Terminate the PPP connection through the LCP Terminate-Request message, and this method is
recommended.
2.
TA can also terminate the PPP connection by changing the DTR level. Set the DTR function by
AT&D2 first, change the DTR level from low to high, and the data connection will be automatically
terminated. After the PPP connection is completely terminated, the USB/UART port will enter the
command mode. Examples are as follows:
Example
//USB/UART port is still in command mode before PPP connection is established.
AT&D2
OK
NOTE
1.
PPP connection termination procedures must be performed in data mode.
2.
PPP connection termination procedures can be performed at any time during the PPP setting or
connecting process.
EC200U&EG915U_Series_PPP_Application_Note
LTE Standard Module Series
15 / 28

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eg915u series

Table of Contents