Pm Board - Siemens TS2000 Service Manual

Transspectral impedance scanning
Table of Contents

Advertisement

TS2000 Service Manual
NOTE:
NOTE:

6.4.9 PM Board

On the PM, there are three red LEDs indicating presence of voltage. In
order to measure the voltages on the PM Board, measurements are
carried out between the ground of the output BNC and the following
points on the PM:
#
1
2
3
4
SPB7-520.840.01.01.02
6-8
In the "Menu Bar," the "Tests" menu will appear.
3.
Click on the Stop/ Start button on the small probe/ large
4.
probe; at the bottom of the screen, the message
"FPS=X.XX appears.
X.XX must be 8.00-+1.00 for the small probe.
Nominal value is 8.66
X.XX must be 2.00-+0.5 for the large probe.
Nominal value is 2.15
Click again on the Start/ Stop button.
5.
In the "Tests" menu, click on "Back to User Menu".
6.
All other programs are for Research and
Development purposes only.
ID
L6
L4
L3
Zener Diode D9 (next to
U98)
RD7409290-0 Rev. F
LED
Value
LED L1
+5V+/-5%
LED L2
+12V+/-
5%
LED L3
-12V+/-
5%
-5V+/-5%

Advertisement

Table of Contents
loading

Table of Contents