INSTALLATION
TOOLS REQUIRED
SPIRIT LEVEL
TAPE MEASURE
8mm MASONRY DRILL BIT
25mm MASONRY DRILL BIT
BEFORE STARTING INSTALLATION, PLEASE ENSURE YOU HAVE ALL SUITABLE EQUIPMENT
AVAILABLE AND UNDERSTAND THE STEPS INVOLVED IN INSTALLATION. IF IN ANY DOUBT,
PROFESSIONAL ADVICE SHOULD BE SOUGHT.
THE INSTALLER MUST ENSURE THAT THE PLANNED POSITION OF THE AIR CONDITIONER IS
SUITABLE, AND THAT THERE ARE NO CABLES, PIPES OR OTHER OBSTRUCTIONS, WHICH
WOULD PRESENT A DANGER AND/OR PREVENT COMPLETION OF INSTALLATION.
180 or 182mm CORE DRILL
SHARP KNIFE
PENCIL
6
DRILL
Need help?
Do you have a question about the IQOOL-SMART15HP and is the answer not in the manual?