Installation - ElectrIQ A1/CMAC10M User Manual

9,200 btu portable industrial air conditioner
Table of Contents

Advertisement

INSTALLATION

COLD AIR OUTLETS
1. Line up the dimple on the Elbow with the
notch on the Hose connector on the top of
the air conditioner.
2. Rotate anticlockwise until a click can be
heard, indicating the elbow has locked into
place.
3. Insert the Cold Air Hose into the Elbow,
again lining up the dimple with the notch in
the Elbow.
4. Rotate the pipe anticlockwise to fix it in
place.
5. The pipe can then be extended and pointed
in the desired direction.
HOT AIR OUTLET
1. Push the Hot air pipe onto the Hot air outlet on the top of the
appliance.
2. Extend the pipe and route it outside.
NOTES:
The best form of installation is through a wall duct. By properly
venting you expel hot air from your room while efficiently
cooling it.
IMPORTANT SAFEGUARDS
If hoses are extended above the permitted length, the unit may
malfunction which can invalidate the warranty. The outlet vent
must be well ventilated and not obstructed as this will cause
the unit to overheat. Keep the all the hoses as straight and
short as possible and avoid bending the air hose by more than
45 degrees in order to maintain the performance of the unit.
Excessive bends in the hose may prevent the unit from
expelling the hot air, which can lead to internal damage which
would invalidate the warranty. Ensure that sufficient space is
left in from the end of the vent pipes (30cm – Cold air, 90cm
Hot air)
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cmac10m

Table of Contents