Service And Maintenance; On-Site Service - Wahlberg Roll Down Manual

Table of Contents

Advertisement

Service and maintenance

WARNING! Read "Safety Information" on page 2 before servicing the Roll Down.
WARNING! Disconnect the Roll Down from AC mains power and allow cooling down for at least
10 minutes before handling.
WARNING! Refer any service operation not described in this user manual to a qualified service
technician.
Attention! Interval of inspections should be determined according to the frequency of use and
the working scenario of the Roll Down.
Attention! Signs of malfunction or poor operation should always lead to an inspection of the
Roll Down, and the Roll Down should be taken out of operation until the error is eliminated.
Parts
Only parts ordered at or approved by Wahlberg Motion Design should be used in the Roll Down
to ensure product function and stability. Contact Wahlberg Motion Design to inquire about spare
parts.

On-site service

On-site service and maintenance can be provided by the Wahlberg Motion Design, giving owners
access to Wahlberg Motion Design's expertise and product knowledge in a partnership that will
ensure the highest level of performance throughout the product's lifetime. Please contact
Wahlberg Motion Design for details.
249.805.013
33
Date: 2021-12-09

Advertisement

Table of Contents
loading

This manual is also suitable for:

249

Table of Contents