Using the mounting rail
The Roll Down has a rail that can be used for mounting the fabric along the entire length of the
tube.
The fabric is mounted by loosening the Hex screws holding the rail in place. When they are all
loose, place the fabric under the rail and tighten the screws again to hold it in place.
Make sure the fabric is mounted on the correct side of the rail. If it is mounted on the wrong side,
it will fold over itself when moving to the TOP limit.
Refer to Appendix on page 35 for additional illustrations.
Using tape
The fabric can also be taped to the tube, using single- or double-faced tape. This allows the fabric
to be mounted at any angle. If tape is used for securing the fabric 2 rounds must remain on the
tube when it is fully rolled out.
249.805.013
13
Date: 2021-12-09