Download Print this page

Enwork Overhead Storage Assembly Procedure

Advertisement

Quick Links

Overhead Storage Assembly Procedure
Rev 0315

Advertisement

loading
Need help?

Need help?

Do you have a question about the Overhead Storage and is the answer not in the manual?

Questions and answers

Summary of Contents for Enwork Overhead Storage

  • Page 1 Overhead Storage Assembly Procedure Rev 0315...
  • Page 2 STEP1: ATTACH THE SUPPORT BRACKETS TO THE GRID FRAME (4) SCREWS AND (4) NUTS AS SHOWN (Figure 1). ATTACH (4) SUPPORT BRACKETS AS INDICATED BUT DO NOT COMPLETELY TIGHTEN FASTENERS (SEE Figure 2) (4) 10-24 X ½” Pan Head Phillips Screw & (4) Nuts Figure 1...
  • Page 3 STEP 2: CENTER OVERHEAD CABINET ON GRID FRAME, OVERHEAD CABINET SHOULD BE RESTING ON THE GRID FRAME AS INDICATED IN FIGURE 2. INSTALL (8) ¼-20 X ½” PAN HEAD PHILLIPS HEAD SCREWS TO SECURE CABINET TO SUPPORT BRACKETS. TIGHTEN SECURELY. ¼-20 X ½”...
  • Page 4 STEP 3: MAKE SURE SUPPORT BRACKET LOWER MOUNTING PLATES ARE POSITIONED WITH THE FASTENERS AND NUTS IN THE SLOTS AS INDICATED, (See Figure 3) TIGHTEN FASTENERS SECURELY. NUTS TO BE POSITIONED Figure 3 INSIDE SLOT AS SHOWN...