STEP 2:
CENTER OVERHEAD CABINET ON GRID FRAME, OVERHEAD CABINET SHOULD BE RESTING
ON THE GRID FRAME AS INDICATED IN FIGURE 2. INSTALL (8) ¼-20 X ½" PAN HEAD PHILLIPS
HEAD SCREWS TO SECURE CABINET TO SUPPORT BRACKETS. TIGHTEN SECURELY.
¼-20 X ½" PAN HEAD
PHILLIPS SCREWS
CABINET SHOULD SET ON TOP
OF GRID FRAME
Figure 2
Need help?
Do you have a question about the Overhead Storage and is the answer not in the manual?
Questions and answers