Spindle Disassembly - Oshkosh JLG 1930ES Service Maintenance Manual

Hide thumbs Also See for JLG 1930ES:
Table of Contents

Advertisement

SECTION 3 - CHASSIS & SCISSOR ARMS

Spindle Disassembly

1. Spindle Sub-Assembly
2. Main Bushing
3. Shaft Ball Bearing
4. Tanged Washer
1. Place unit on bench with planet gears facing up.
2. Remove 3 output planet shafts.
NOTE: These planet shafts are held in with a press fit. Use
the tapped hole in the end of the pin in conjunction
with a slide hammer or similar tool to remove them.
3. Remove the output planet gear, thrust washer, and
tanged washer out of each gear "window" of the
spindle.
NOTE: The output planet gears are a very similar size to the
input planet gears, tag or label the planet gears to
avoid confusion.
4. Using a screwdriver remove the shaft bearing snap
ring.
5. Remove the shaft ball bearing from the center
bore.
3-10
5. Thrust Washer
6. Output Planet Gear
7. Output Planet Pins
8. Main Bearing
Figure 3-7. Spindle DIsassembly
6. Press out the motor shaft seal from the center
7. Remove the main bearing from the outside diame-
NOTE: This bearing is held in with a press fit. You will need to
8. Press out the main bushings at the top of the spin-
9. Remove the motor O'ring from the groove on side
9. O-Ring
10. Shaft Seal
11. Snap Ring
12. Needle Roller Bearings
bore.
ter of the spindle.
pry against the spindle to remove it. The bearing will
need to be replaced when this is done.
dle neck.
opposite from the carrier side.
3121656

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jlg 2032esJlg 2632esJlg 2646esJlg 3246es

Table of Contents