Page 1
INSTALLATION AND OPERATING INSTRUCTIONS FOR 24/7 ONLINE PARTS REPLACEMENT 9404148E Rev 09/17/2021 parts.kidkraft.com parts.kidkraft.eu KidKraft, Inc. KidKraft Netherlands BV 4630 Olin Road Olympisch Stadion 8 TWO-PERSON ASSEMBLY TIME WARNING. ONLY FOR OUTDOOR ASSEMBLY...
Page 2
Congratulations on purchasing a KidKraft product! Our items are made of high-quality, durable Cunninghamia Lanceolata wood from the cypress family. Lumber from these trees are known for their light weight and excellent strength. The porosity of this wood allows the moisture to absorb and evaporate in the fibers, resisting rot and bugs.
Page 3
Warnings and Safe Play Instructions CONTINUOUS ADULT SUPERVISION REQUIRED. Most serious injuries and deaths on playground equipment have occurred while children were unsupervised! Our products are designed to meet mandatory and voluntary safety standards. Complying with all warnings and recommendations in these instructions will reduce the risk of serious or fatal injury to children using this play system.
Page 4
Protective Surfacing - Reducing Risk of Serious Head Injury From Falls One of the most important things you can do to reduce the likelihood of serious head injuries is to install shock-absorbing protective surfacing under and around your play equipment. The protective surfacing should be applied to a depth that is suitable for the equipment height in accordance with ASTM F1292.
Instructions for Proper Maintenance Your KidKraft Play System is designed and constructed of quality materials with your child’s safety in mind. As with all outdoor products used by children, it will weather and wear. To maximize the enjoyment, safety and life of your Play Set, it is important that you, the owner, properly maintain it.
Page 6
About Our Wood KidKraft Premium Play Systems uses only premium playset lumber, ensuring the safest product for your children’s use. Although we take great care in selecting the best quality lumber available, wood is still a product of nature and susceptible to weathering which can change the appearance of your set.
Page 7
KidKraft Limited Warranty MISSING OR DAMAGED PARTS: KidKraft will replace any parts within 90 days from date of purchase found to be missing from or damaged in the original packaging. See Fig.1 Fig. 1 Product Age (All Parts) Consumer Pays...
Page 10
Part Identification (Reduced Size) WOOD CHART (4) CE Floor Board 1 x 4 x 32-1/2" Nominal Size Actual Size ⅜ 1½" x 5 " 0304 2" x 6" 3630304 Box 1 ⅜ ⅜ " x 3 " 2" x 4" ⅜...
Page 11
Part Identification (Reduced Part Size) WOOD CHART Nominal Size (1) Ridge 2 x 2 x 46-1/2" Actual Size 1½" x 5 ⅜ " 3641794 Box 1 2" x 6" 1794 ⅜ ⅜ " x 3 " 2" x 4" ⅜ "...
Page 14
Hardware Identification (Actual Size) 1/4 x 3" (3) LS3 - Lag Screw - (9262230) Hex Bolt 1/4 x 2" Hex Bolt 1/4 x 1-1/2" (2) H1 - (24) H2 - - (9277220) - (9277212) Hex Bolt 1/4 x 2-3/4" (1) H11 - - (9277223) Hex Bolt 1/4 x 2-1/2"...
Page 15
Before you discard your cartons fill out the form below. • The Batch # is located on the end of each carton. The tracking number is located on the KidKraft ID Plaque (9330355). • Please retain this information for future reference. You will need this information if you contact the Consumer Relations Department.
Step 1: Swing Beam Assembly Fig. 1.3 Warning: For your childs safety, orientate the swing hangers as A: In the middle holes of (1772) shown to ensure your swing will have proper swing motion when CE SW Beam Back install 2 Bolt installed.
Page 17
Step 2: Swing End Assembly A: Attach 2 (2803) SW Posts to (4920) SW Upright using 2 (G4) 5/16 x 4” Hex Bolts (with lock washer, flat washer and t-nut). (fig. 2.1) B: Attach (4921) SW Support to both (2803) SW Posts and (4920) SW Upright using 3 (G5) 5/16 x 4-1/2” Hex Bolts (with lock washer, flat washer and t-nut).
Page 18
Step 3: Swing Beam A: Place (4919) SW Rail Block in the centre between (1773) CE SW Beam Front and (1772) CE SW Beam Back and attach beams with 1 (H8) 1/4 x 4-1/4” Hex Bolt (with flat washer, lock washer and t-nut). (fig. 3.1 & 3.2) B: Attach Swing Beam Assembly to the side of the Swing End Assembly with the overhang (fig.
Page 19
Step 4: Swing Side Assembly Note: Pre-drill all holes using a 1/8” drill bit before installing the lag screws. A: To 2 (1771) Posts attach (1770) SW Ground and (1759) SW Floor using 4 (H2) 1/4 x 2” Hex Bolts (with lock washer, flat washer and t-nut) in each board.
Page 20
Step 5: Wall Side Assembly A: To 2 (1771) Posts loosely attach (1759) SW Floor and (1769) Ground Side with 4 (H2) 1/4 x 2” Bolts (with lock washer, flat washer and t-nut) per board. (fig. 5.1) Fig. 5.1 1759 Notice hole towards back Back 1797...
Step 6: Front Frame Assembly A: Attach (1764) Floor Front to (1771) Posts with 2 (H6) 1/4 x 4-3/4” Bolt (with flat washer, lock washer and t-nut). Hex Bolts to be installed from the inside of the assembly. (fig. 6.2) B: Attach (1752) Top Front to (1771) Posts with 4 (S7) 12 x 2”...
Page 22
Step 7: Rock Rail Assembly A: Attach (1766) Corner Block 1/2” from bottom of (1765) Rock Rail with 2 (S3) 8 x 2-1/2” Wood Screws as shown in fig. 7.1. B: Place (1765) Rock Rail with Corner Block against (1764) Floor Front so the top of the angled edge is 3/8” above (1764) Floor Front.
Page 23
Step 8: Attach Centre Divider A: Attach (1751) Centre Divider to (1752) Top Front with 1 (H2) 1/4 x 2” Bolt (with flat washer, lock washer and t-nut) from outside of the assembly and to (1764) Floor Front with 1 (H11) 1/4 x 2-3/4” Bolt (with flat washer, lock washer and t-nut) from inside the assembly.
Page 24
Step 9: Attach Gusset A: Make sure assembly is square and then place 1 (0312) Gusset tight to the under side of (1764) Floor Front and to (1771) Post from the inside of the assembly. Make sure the gusset is flush to the outside of the post and attach with 2 (S4) #8 x 3”...
Page 25
Step 10: Attach Lower Front A: Attach (1767) Lower Front flush to the top of (1766) Corner Block at (1769) Ground Side with 2 (S15) #8 x 1-3/4” Screws. (fig. 10.1 & 10.2) B: Make sure (1767) Lower Front is level and then attach to (1765) Rock Rail with 2 (S15) #8 x 1-3/4” Screws. (fig.
Page 26
Step 11: Floor Back Assembly A: Attach (1762) Floor Back to (1761) Side Joist with 2 (H3) 1/4 x 2-1/2” Bolts (with flat washer, lock washer and t-nut) and 2 (S7) 12 x 2” Pan Screws (with flat washers) as shown in fig. 11.1. Bolts to be installed on (1761) Side Joist side and screws installed from (1762) Floor Back side.
Page 27
Step 12: Floor Back Assembly Pre-drill all pilot holes using a 1/8” drill bit before installing the lag screws. A: On the back side of the assembly attach (1768) Lower Back flush to the bottom and outside edge of (1771) Posts with 2 (LS3) 1/4 x 3”...
Page 28
Step 12: Floor Back Assembly cont. C: Attach 2 (0359) Front Dividers to (1762) Floor Back with 1 (H1) 1/4 x 1-1/2” Hex Bolt (with lock washer, flat washer and t-nut) per board. Be sure to keep bolts loose. (fig. 12.4 & 12.6) D: Attach each (0359) Front Divider to (1758) Top Back using 1 (PB2) 1/4 x 1-1/4”...
Page 29
Step 13: Chalk Wall Assembly A: Place the Chalk Wall Tarp in between each (0359) Front Divider and (1758) Top Back. Make sure tarp is smooth and tight and then attach to (1758) Top Back with 3 (S5) #8 x 1/2” Pan Screws (with #8 flat washer). Tighten the bolts in both (0359) Front Dividers.
Page 30
Step 14: Floor Frame Assembly A: From inside of the assembly, measure 3-1/8” down from the top of both (1759) SW Floors then attach (1763) Floor Joist to each board with 1 (S4) #8 x 3” Wood Screws per end. Make sure the (1763) Floor Joist is installed with the side measuring 1-3/8”...
Page 31
Step 15: Attach Floor Boards A: Install 1 (1774) CE Gap Board to each end of the assembly attaching to (1761) Side Joist, (1763) Floor Joist and (1764) Front Floor using 5 (S2) #8 x 1-1/2” Wood Screws per board. Make sure boards are tight to each (1759) SW Floor, (1762) Floor Back and each (1771) Post.
Page 32
Step 16: Attach Ground Stakes MOVE FORT TO FINAL LOCATION. FINAL LOCATION MUST BE ON LEVEL GROUND A: Drive 2 (0318) Ground Stakes 10-1/2” into the ground against 2 (1771) Posts and (1770) SW Ground. Attach to (1771) Posts using 2 (S3) #8 x 2-1/2” Wood Screws per ground stake. (fig. 16.1 & 16.2) Fig.
Step 17: Wall Assembly A: On the Swing Side Wall attach 1 (0304) CE Floor Board on each side of the (2782) SW Mount with 4 (S1) #8 x 1 1/8” Wood Screws per board. Make sure the bottom of the boards are 1” up from the (1774) CE Gap Boards and there is approximately 3”...
Page 34
Step 18: Attach Tarp Frame A: Attach (1794) Ridge to (2783) Tarp Upright and flush to end of (2782) SW Mount using 3 (S3) #8 x 2-1/2” Wood Screws as shown in fig. 18.1. B: Pre-drill pilot holes for the screws using a 1/8” drill bit and then attach 1 (1796) Top End to each end of each (1797) Side Top, making sure the pilot holes are centred on the end of (1797) Side Top, with 4 (S2) #8 x 1-1/2”...
Step 19: Attach Canopy A: Place Canopy over (1794) Ridge making sure bottom edges of Canopy are even on both sides of assembly. (fig. 19.1) B: Secure one side by attaching Canopy to 1 (1796) Top End using 5 (S5) #8 x 1/2” Pan Screws (with #8 flat washer).
Page 36
Step 20: Attach Rock Rail A: Place 1 (1765) Rock Rail 17” from the already installed (1765) Rock Rail so the top measures 3/8” above (1764) Floor Front then attach both (1765) Rock Rails to (1764) Floor Front with 2 (S15) #8 x 1-3/4” Wood Screws per board and second (1765) Rock Rail to (1767) Lower Front with 2 (S15) #8 x 1-3/4”...
Page 37
Step 21: Attach Slide A: Beside Rock Wall, centre slide in opening between (1751) Centre Divider and (1771) Post. B: Pre-drill 1/8” pilot holes and attach slide to fort through the floor boards and into (1764) Floor Front using 2 (S7) #12 x 2”...
Page 38
Step 22: Attach Swing To Fort A: Attach Swing Assembly from Step 3 to (2782) SW Mount with 1 (G5) 5/16 x 4-1/2” Hex Bolt (with lock washer, flat washer and t-nut) and 1 (G8) 5/16 x 2” Hex Bolt (with 2 flat washers and 1 lock nut) as shown in fig. 22.1 & 22.2.
Page 39
Step 23: Attach Swings Step 23: Attach Swings WARNING: If Bolt protrudes A: Insert flexible Swing Hanger Cover over hook. (fig. 23.1) Check entire play centre beyond T-Nut for bolts protruding beyond T-Nuts. Use extra washers to eliminate this condition. B: Slide Swing Hanger Cover around hook until at top.
Page 40
Step 24: Attach Swing End Ground Stakes A: Drive 1 (0318) Ground Stake 10-1/2” into the ground at each (2803) SW Post on the inside of the assembly and attach with 2 (S3) #8 x 2-1/2” Wood Screws per ground stake. (fig. 24.1 & 24.2) WARNING: To prevent tipping and avoid potential injury, stakes must be driven 10-1/2”...
Page 41
Tracking Number: Número Numèro de Suivi: seguimie read by a supervising adult. your set that is easily seen and read by a supervising adult. Hardware Other Parts #8 x 1/2” Pan Screw 1 x KidKraft I.D. Plaque...
Page 44
Would you recommend the purchase of our products to friends and family? Comments: MAIL TO: Fill out your registration card online at KidKraft https://prdregistration.kidkraft.com/ 4630 Olin Road Dallas, TX 75244 United States KidKraft would like to say Thank You for Attention: Customer Service your time and feedback.