Procedure Overview - Agilent Technologies 85103E Installation Manual

Network analyzer
Table of Contents

Advertisement

85103E Upgrade Package (8510A to 8510C)
Installing the Upgrade

Procedure Overview

Step 1. Check the upgrade package contents.
Refer to
Table
1. If an item is missing, refer to
assistance.
Step 2. Assemble items not included in the upgrade package.
If needed, obtain the required items listed in
supplied in this package.
Step 3. Be sure you have a static-safe work station.
Check for the following:
• The static mat sits on a clean, flat, sturdy surface.
• The static mat has a connection to earth ground.
• The static mat has a wrist strap connected to it.
Step 4. Familiarize yourself with the upgrade process.
Refer to
"Installing the Upgrade"
Step 5. Follow the upgrade instructions.
Follow the detailed instructions provided, beginning with
Operation" on page 8
Step 6. Dispose of the replaced 85101C display/processor.
Recycle or dispose of the 85101C display/processor according to your state or local
requirements. The battery on the A7 I/O board and the A11 display (CRT) may have
special requirements. When disposing of the cathode ray tube (CRT display), observe the
following precautions:
WARNING
The CRT can pose a shock hazard if not properly discharged.
Explosion or implosion of the CRT may cause personal injury.
Only a properly trained individual should release the vacuum.
4
for an overview of the required upgrade steps.
to install and check your upgrade installation.
"Contacting Agilent" on page iv
Table 2
for your upgrade that are not
"Checking 8510 System
85103E Performance Upgrade Installation Manual
for

Advertisement

Table of Contents
loading

Table of Contents