Attaching New Labels; Procedure - Agilent Technologies 85103E Installation Manual

Network analyzer
Table of Contents

Advertisement

85103E Upgrade Package (8510A to 8510C)

Attaching New Labels

Attaching New Labels

Procedure

There are two grey labels in the upgrade kit, but you will use only one depending on the
front dress panel of the analyzer (check the label size). The rest of the labels are metallic
silver.
NOTE
You may not need all the labels supplied in your kit. If you wish, use the
supplied optional serial tags to note the original 85101 and 85102 serial
numbers. If not, dispose of the unused tags.
Using
Figure 8
for reference, attach the new labels as appropriate on the 85101C and the
newly upgraded 85102.
1. Place the appropriate grey label on the front panel of the 85102.
2. Affix the remaining labels as shown in
3. Write the installation date (in ink) on the two installation date labels.
4. Continue with
"Upgrading an 8360 Source."
NOTE
While a
absolutely necessary, do not try to replace the
break the key holder behind the front panel when you remove the old
key. This also applies to the
If replacing the hardkeys is absolutely necessary, the 85102 front panel
should be disassembled and great care taken to minimize the chance for
breakage.
20
Figure
hardkey is supplied with the upgrade kit, unless
DISC
USER PRESET
85103E Performance Upgrade Installation Manual
8.
TAPE
hardkey.
key. You can easily

Advertisement

Table of Contents
loading

Table of Contents