Procedure Overview - Agilent Technologies 85103F Installation Manual

Network analyzer performance upgrade
Table of Contents

Advertisement

The 85103F Upgrade Package (8510A/B to 8510C)
Installing the Upgrade

Procedure Overview

Step 1. Check the upgrade package contents.
Refer to
Table
1. If an item is missing, refer to
assistance.
Step 2. Assemble items not included in the upgrade package.
If needed, obtain the required items listed in
supplied in the package.
Step 3. Be sure you have a static safe work station.
Check for the following:
• The static mat sits on a clean, flat, sturdy surface.
• The static mat has a connection to earth ground.
• The static mat has a wrist strap connected to it.
Step 4. Familiarize yourself with the upgrade requirements.
Refer to
"Installing the Upgrade" on page 2
Step 5. Follow the upgrade instructions.
Follow the detailed instructions provided, beginning with
Operation" on page 7
Step 6. Recycle/dispose of the replaced 85101A/B display/processor.
Recycle or dispose of the 85101A/B display/processor according to your state or local
requirements. The battery on the A7 I/O board and the A11 display (CRT) may have
special requirements. When disposing of the cathode ray tube (CRT display), observe the
following precautions:
The CRT can pose a shock hazard if not properly discharged.
WARNING
Explosion or implosion of the CRT may cause personal injury.
Only a properly trained individual should release the vacuum.
4
to install and check your upgrade installation.
"Contacting Agilent" on page iv
Table 2
for your upgrade that are not
for an overview of the required upgrade steps.
"Checking 8510 System
85103F Performance Upgrade Installation Manual
for

Advertisement

Table of Contents
loading

Table of Contents