Installing The Tray Pan, Draft Shield And Pan Support; Leveling The Moisture Analyzer - OHAUS MB95 Instruction Manual

Moisture analyzer
Hide thumbs Also See for MB95:
Table of Contents

Advertisement

MB95
3.3

Installing the Tray Pan, Draft Shield and Pan Support

3.4

Leveling the Moisture Analyzer

Exact horizontal positioning and stable installation are prerequisites for repeatable results.
To compensate for small irregularities or inclinations at the location, the instrument can be
leveled.
Adjust the leveling feet of the Moisture Analyzer
until the air bubble in the indicator is centered. The
level indicator is located under the cover towards
the rear of the Moisture Analyzer.
Attention: The instrument should be leveled each
time its location is changed.
Leveling
Feet
Leveling
Indicator
Lift the cover straight up and Install the tray
pan in the base of the heating chamber.
Install the draft shield (only one position
possible) on top of the tray pan.
Install the pan support into position. Turn the
pan support until it engages. In the locked
position, the arm of the pan support points
directly towards the front of the analyzer.
EN-9

Advertisement

Table of Contents
loading

Table of Contents