Gas Connection - Viessmann B2TF Installation And Service Instructions Manual

Gas condensing storage combi boiler with 7 inch colour touchscreen
Table of Contents

Advertisement

Gas connection

A
Fig. 9
1. If the gas connection has not been fitted previ-
ously, seal gas shut-off valve
nection.
When carrying out any work on gas connection fit-
tings, counterhold with a suitable tool. Never trans-
fer any forces to the internal components.
Information on operation with LPG
Install an external safety solenoid valve if the boiler
is installed below ground level.
An EM-EA1 extension (accessories) is required to
connect the safety solenoid valve.
2. Check for leaks.
Danger
Escaping gas leads to a risk of explosion.
Check all connections on the gas side (also
inside the appliance) for tightness.
Note
Only use suitable and approved leak detection
agents (EN 14291) and devices for the tightness
test. Leak detection agents with unsuitable constit-
uents (e.g. nitrides, sulphides) can cause material
damage.
Remove residues of the leak detection agent after
testing.
!
Please note
Excessive test pressure will damage the
boiler and the gas train.
Max. test pressure 150 mbar (15 kPa).
Where higher pressure is required for tight-
ness tests, disconnect the boiler and the gas
train from the main supply pipe (undo the fit-
ting).
A
to the gas con-
A
A
3. Purge the gas line.
Installation sequence
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitodens 222-f

Table of Contents