Viessmann B2TF Installation And Service Instructions Manual page 39

Gas condensing storage combi boiler with 7 inch colour touchscreen
Table of Contents

Advertisement

Checking the static pressure and supply pressure
C
A
Fig. 29
Cover panel
A
B
Test connector
Type plate
C
Danger
CO formation as a result of incorrect burner
adjustment can have serious health implications.
Carry out a CO test before and after work on
gas appliances.
Operation with LPG
Purge the LPG tank twice on commissioning/replace-
ment. Vent the tank and gas connection line thoroughly
after purging.
01. Close the gas shut-off valve.
02. Undo clips and remove cover panel
03. Undo screw in test connector
but do not remove it. Connect the pressure gauge.
04. Open the gas shut-off valve.
05. Test the static pressure and record it in the report.
Set value: Max. 57.5 mbar (5.75 kPa).
06. Start the boiler.
Note
During commissioning, the appliance can enter a
fault state if there are airlocks in the gas line.
Reset the appliance after approx. 5 s (see operat-
ing instructions).
B
07. Check the supply (flow) pressure. For set values,
08. Record the actual value in the report.
09. Shut down the boiler. Close the gas shut-off valve.
.
A
10. Remove the pressure gauge. Tighten the screw in
on the gas train,
B
11. Open the gas shut-off valve and start the appli-
12. Fit cover panel
Commissioning, inspection, maintenance
see the following table.
Note
Use a suitable measuring device with a resolution
of at least 0.1 mbar (0.01 kPa) to check the supply
pressure.
Implement measures as indicated in the table
below.
test connector
B
.
ance.
Danger
Gas escaping from the test connector leads
to a risk of explosion.
Check gas tightness at test connector
.
A
.
B
39