Viessmann B2TF Installation And Service Instructions Manual page 55

Gas condensing storage combi boiler with 7 inch colour touchscreen
Table of Contents

Advertisement

Checking pre-charge pressure and DHW expansion vessel (if installed)
Fig. 46
Checking the safety valve function
Checking the electrical connections for firm seating
Checking gas equipment for leaks at operating pressure
Danger
Escaping gas leads to a risk of explosion.
Check gas equipment (including inside the appli-
ance) for gas leaks.
Checking the combustion quality
The electronic combustion controller automatically
ensures optimum combustion quality. During commis-
sioning/maintenance, only the combustion values need
to be checked. For this, measure the CO content and
the CO
or O
content.
2
2
Permissible CO content
The CO content must be < 1000 ppm for all gas types.
A
C
B
Commissioning, inspection, maintenance
1. Check the static pressure of the DHW line down-
stream of the pressure reducer and adjust if
required. Set value: Max. 3.0 bar (0.3 MPa)
2. Close the on-site shut-off valve in the cold water
line.
Relieve the water pressure.
3. Turn lever on valve to position
4. Check the pre-charge pressure of the DHW expan-
sion vessel and adjust if required. Set value: Static
pressure minus 0.2 bar (20 kPa).
5. Turn lever on valve back to position
on-site shut-off valve in the cold water line.
Note
Only use suitable and approved leak detection agents
(EN 14291) and devices for the leak test. Leak detec-
tion agents with unsuitable constituents (e.g. nitrides,
sulphides) can cause material damage.
Remove residues of the leak detection agent after test-
ing.
Note
To prevent operating faults and damage, operate the
appliance with uncontaminated combustion air.
.
B
. Open the
A
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitodens 222-f

Table of Contents