Proper Piping Practice; Gas Connection And Piping - Viessmann B1KA Installation And Service Instructions Manual

Wall-mounted, gas-fired condensing boilers on demand domestic hot water with combi boiler
Hide thumbs Also See for B1KA:
Table of Contents

Advertisement

Connections
Boiler Connections
2 imperfect threads
Legend
A Boiler water supply connection NPT ¾ in. (male thread)
B DHW tank heating supply NPT ¾ in. (male thread)
(for B1HA) or DHW connection NPT ½ in. (male thread)
(for B1KA)
C Gas connection NPT ¾ in. (male thread)
D DHW tank heating return NPT ¾ in. (male thread)
(for B1HA) or DCW connection NPT ½ in. (male thread)
(for B1KA)
E Boiler water return connection NPT ¾ in. (male thread)
Note: The B1HA DHW supply and return connections are
supplied capped. For installations that require DHW
tank connections remove caps. For installations that
do not require DHW tank connections leave caps
installed.
18
Vitodens 100-W, B1HA/B1KA 26 to 125 Combi Installation/Service
(continued)
Use moderate amount of dope
Leave 2 threads bare

Proper piping practice

Support piping by proper suspension method.
Piping must not rest on or be supported by boiler.

Gas connection and piping

1. Make gas connection in accordance with codes
CAN/CSA B149.1 or 2 in Canada. In the United
States, use the National Fuel Gas Code ANSI Z223.1/
NFPA 54, as well as local codes where applicable.
2. Close gas shutoff valve on boiler.
3. Perform leak test.
4. Bleed air from gas supply pipe.
See following page for details on gas connection and piping.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

B1ha279B1ka111B1ha278B1haVitodens 100-w

Table of Contents