12_HIGH CO2 IN O2
18_LIQUID LEAK DET
20_NO REAGENTS
(can also be programmed as a
warning or notification condition)
104_MOTHERBOARD
FUSE4
105_MOTHERBOARD
FUSE5
106_MOTHERBOARD
FUSE6
High level of CO
has been detected in
2
the input oxygen gas.
Go to Simulate menu and read the CO
analyzer's CO
ppm value. If this value
2
is greater than 250-300ppm, check the
oxygen purity.
BioTector's liquid leak detector is
activated by the four liquid leak
detector points fitted in the BioTector.
First point is in the main analysis
enclosure cabinet, the second point is
in the oxygen concentrator cabinet, the
third point is in the Mixer Reactor and
the fourth point is the reagent pumps.
See figure 2 in Section
Analysis Enclosure
BioTector has calculated that the
reagent containers should be empty.
Fuse 4
(for Cooler and Ozone Generator)
is blown on the motherboard. See
Section
5.2.4
System Fuse
Specifications
for details.
Fuse 5
(for sample/acid/base pumps, mixer
reactor, sample/stream/manual valves,
reactor/exhaust valves, cooler fan, ozone
destructor, ozone generator fan)
on the motherboard. See Section
System Fuse Specifications
details.
Fuse 6
(which is reserved for future)
blown on the motherboard. See Section
5.2.4
System Fuse Specifications
details.
Check the quality of oxygen
following the Oxygen Purity Test
procedures in
2
and
If the oxygen purity test is
satisfactory, open CO
and clean the optics.
If problem persists, replace the
CO
2
If the oxygen purity test is
unsatisfactory, replace the oxygen
concentrator.
Check for a liquid leak in the
BioTector main cabinet and in the
oxygen concentrator cabinet.
Check for a liquid leak in Mixer
Reactor by unplugging the leak
detector connector on the bottom
of the reactor.
Check for a liquid leak in the acid
4.1.1
and base pumps.
for details.
Rectify the leak.
Change reagents, and reset
reagent monitor in Install New
Reagents menu.
Confirm that the reagent
volume/container size input values
are correct in the Reagents
Monitor menu.
If necessary, to readjust the
number of days reagents last, see
Section
Monitor
Check/replace fuse 4 (F4).
Check fuse holder and confirm
that the fuse is snapped in tightly
into the fuse holder.
Check/replace fuse 5 (F5).
Check fuse holder and confirm
that the fuse is snapped in tightly
is blown
into the fuse holder.
5.2.4
Go to Simulate menu and activate
for
each device connected.
is
Check/replace fuse 6 (F6).
Check fuse holder and confirm
for
that the fuse is snapped in tightly
into the fuse holder.
Section 7
Analyzer Commissioning
Startup.
analyzer
2
Analyzer filters.
8.2.6
Reagents
for details.
Page 135