Installation; Inserting/Exchanging Gobos; Rigging - Future light DMH-32 RGBW User Manual

Led-moving-head
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

Inserting/Exchanging gobos

DANGER!
Install the gobos with the device switched off only.
Unplug from mains before!
If you wish to use other forms and patterns as the standard-gobos, or if gobos are to be exchanged, please
follow the instructions below:
CAUTION!
Never unscrew the screws of the rotating gobo
as the ball bearing will otherwise be opened!
Remove the fixation-ring with an appropriate tool. Remove the gobo and insert the new gobo. Press the
fixation-ring together and insert it in front of the gobo.
When installing metal gobos, please make sure that the mirror-inverted side points away from the LED.
When installing glass-gobos, please make sure that the coated side points to the LED.

Rigging

The installation of the projector has to be built and constructed in a way that it can hold 10 times the weight
for 1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
33/52
00076667.DOC, Version 1.1

Advertisement

Table of Contents
loading

This manual is also suitable for:

51841828

Table of Contents