Download Print this page

Jaypro Sports BBLD-5000 Manual

Line drive batting cage

Advertisement

Quick Links

--- Line Drive Batting Cage ---
BBLD-5000
Call Jaypro Sports Equipment at 1-800-243-0533 during
regular business hours for technical support.
www.jaypro.com
Rev B
9/1/2021
Page 1 of 17

Advertisement

loading
Need help?

Need help?

Do you have a question about the BBLD-5000 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Jaypro Sports BBLD-5000

  • Page 1 --- Line Drive Batting Cage --- BBLD-5000 Call Jaypro Sports Equipment at 1-800-243-0533 during regular business hours for technical support. www.jaypro.com Rev B 9/1/2021 Page 1 of 17...
  • Page 2 BOX WRENCHES, ADJUSTABLE WRENCHES, OR SOCKET SET 3/16” OR 7/32” ALLEN WRENCH RUBBER MALLET 8 FT OR 10 FT STEP LADDER RAGS, CLEANING SOLUTION HOW YOUR BBLD-5000 IS RECEIVED VS. LIST OF MATERIALS PACKAGE ITEM NUMBERS IN LIST OF MATERIALS (NEXT PAGE) BBLD-5DRJ BBLD-5BCJ...
  • Page 3 JAYPRO SPORTS THE LINE DRIVE BATTING CAGE, BBLD-5000 LIST OF MATERIALS (MAIN FRAME) Rev B 9/1/2021 Page 3 of 17...
  • Page 4 • Unpack all parts and check against parts list to ensure that all have been included. • Select a large clear flat area to assemble the cage. BBLD-5000 QUICK REFERENCE (SEE EXPLODED VIEWS OF DIFFERENT SECTIONS FOR HARDWARE CALLOUTS) Rev B...
  • Page 5 Assemble Lower Frame: Rev B 9/1/2021 Page 5 of 17...
  • Page 6 Build and Install Upper Frame Sections: Rev B 9/1/2021 Page 6 of 17...
  • Page 7 Rev B 9/1/2021 Page 7 of 17...
  • Page 8 Assemble Front Wheel Assembly: Rev B 9/1/2021 Page 8 of 17...
  • Page 9 Assemble Rear Wheel Assembly: Rev B 9/1/2021 Page 9 of 17...
  • Page 10 Rev B 9/1/2021 Page 10 of 17...
  • Page 11 Assemble struts: (BBLS123) After the frame is fully assembled, check all hardware to make sure it is tightened and all joints are secured. Raise the upper frame arches into position using the strut pipes and check for alignment (see setup instructions). •...
  • Page 12 Attach net: The outer perimeter of the net is to be fully laced to both the front arch and the base of the frame. See detail on next page showing how to lace if unfamiliar with lacing. The net will be suspended from the center two arches by about 6”.
  • Page 13 7. Once the net is properly centered, go back to the TOP FRONT center point and lace the leading edge of net securely to the front arch. Starting from the center, lace to one side and then the other. 8. After the net is fully laced to the front arch – from the rear of the cage, carefully raise the front arch section using two struts (two people required, one strut each side).
  • Page 14 Attach skirt: (IF PURCHASED) 1. Fully raise the upper portion of the cage. 2. Attach the vinyl skirt to the top and bottom pipes of the lower frame using the zip ties. 3. For best results, start at the center and work out to the front corners. 4.
  • Page 15: Set-Up And Transport

    SET-UP AND TRANSPORT Raising and Lowering the Upper Cage: NOTE: At least two people are required for the following steps. Caution: Keep body parts clear of pinch points between pipes and fittings. 1. Two struts are required to raise and support each arch. The raising of each arch must be done in tandem, with equal force and extension.
  • Page 16 TRANSPORTING CAGE: The cage can be transported by going forward or backward. Transporting the cage should be done with 2 or 3 people. Note: Cage should only be transported in the fully folded position. Never move the cage when fully raised. 1.
  • Page 17: Maintenance Instructions

    If possible, as part of seasonal storage, store indoors (net can be removed if desired to extend the life of this item; see catalog or call number listed above if replacement net is needed). For replacement parts, information, or questions, please call Jaypro Sports at 1-800-243-0533 or find www.jaypro.com us online at...