Berbel Skyline Frame BIH 100 SKF Operating And Installation Instructions page 12

Island hood
Table of Contents

Advertisement

Installation
6
☞ Screw the nuts and the washers onto the bolt anchors in
the position of the lock holes.
☞ Ensure that there is at least a 6 mm gap between the
ceiling and the top edge of the washers.
☞ Push the ceiling mounting plate over the nuts in the lock
holes.
☞ Twist the ceiling mounting plate so that it is held by the
nuts.
☞ Ensure that the ceiling mounting plate is hanging
securely.
☞ Screw the nuts and the washers onto the bolt anchors in
the slots.
☞ Ensure that the ceiling mounting plate is aligned parallel
to the hob's front edge.
☞ Tighten the nuts cross-wise using the spanner.
☞ Ensure that all nuts are fully tightened.
The ceiling mounting plate is hanging securely and aligned
correctly on the ceiling.
12
The Wieland socket, cable anchor and earthing cable can
be installed in the pre-drilled positions on either side of the
ceiling mounting plate.
D WARNING!
Risk of death due to electric shock!
Touching live parts can cause an electric shock, burns or
death.
☞ Ensure that the power supply is switched off and remains
so.
☞ Observe the voltage specifications on the ratings plate.
☞ Connect the Wieland socket to the power supply
provided by the customer.
☞ Connect the Wieland socket to the ceiling connection
plate.
☞ Route the cables so that they are not kinked, crushed or
damaged.
☞ Make sure that the device can be disconnected on all
poles from the electricity supply after installation.
6006244_0 – 30.05.2022

Advertisement

Table of Contents
loading

Table of Contents