Receiving And Installation; Receiving Equipment - BAC BCP2D Installation, Operating, Maintenance

Automatic dosing and bleed control package
Table of Contents

Advertisement

BCP2D
4

RECEIVING AND INSTALLATION

Receiving Equipment

Before accepting the BCP2D equipment and prior to signing the bill of lading, all equipment should be checked
thoroughly for any shipping damage. Make sure that all required equipment noted on the bill of lading is
received. Check the model and serial number against the packing list.
Receiving / Inspection check list
(1) BCP2D panel
(2) chemical drums
(1) water meter
(1) set of 2 suction strainers and suction tubes
10
W W W . B A L T I M O R E A I R C O I L . E U
4 Receiving and Installation
4 Receiving and Installation

Advertisement

Table of Contents
loading

Table of Contents