Pump Installation:

1. Attach hardware that fastens the pump mount to the cantilever pump base or attach the hardware that fastens the
pump feet to the pump mount. See Figure 18.
2. Attach the flange hardware and gaskets to the suction and discharge flanges of the pump volute. See Figure 16.
3. After the new pump and new gaskets are installed and all connections are properly fastened, open the bypass valve for
the new pump.
4. Open the suction valve for the new pump.
5. If the newly installed pump is to be operated, refer to the instructions for pump switch over.
Vertex™ Evaporative Condenser Operation & Maintenance Manual – Operation Considerations for Accessories
Figure 18. Pump Mounting
Cantilever
Pump Base
Pump
Mount
Pump Feet