Multi-Cell Unit Installation

Refer to the submittal drawing unit print for the proper orientation of
each cell. Multi-cell unit installations require field sealing of the basin
where the two cells are joined. The following procedure should be
followed to join basin sections.
1st basin
section installed on
supports
Figure 5. Installing Multi-section basin
2nd (or subsequent) basin section being
lowered into position prior to joining to
basin section(s) already on supports
Unit Rigging & Assembly
Field Sealing of Basin to Casing
Post Joint
Multi-Cell Unit Installation