MAINTENANCE INSTRUCTIONS
Baltimore Aircoil Company equipment needs to be
properly
installed,
Documentation of the equipment used, including a
drawing, technical data sheet and this manual should be
kept on record. To achieve long, trouble-free and safe
operation, it is necessary to establish an operating plan
including a programme of regular inspection, monitoring
and maintenance. All inspections, maintenance and
monitoring actions should be recorded in a cooling system
logbook. The operating and maintenance instructions
published here can be used as a guide to achieve these
goals.
In addition to establishing the operating plan and the
cooling system logbook it is recommended to conduct a
cooling system risk analysis, preferably by an independent
third party.
For the cooling system, scale, corrosion and biological
control must be established and initiated when the system
is first filled with water and administered on a regular
basis thereafter in accordance with recognized Codes of
Practice. Water sampling, test results and corrective
actions should be recorded in the cooling system logbook.
For more specific recommendations on keeping your
cooling system efficient and safe, contact your local BAC
representative.
VTL
VFL
VCL
operated
and
maintained.
OPERATING AND
Cooling Towers
Closed Circuit Cooling Towers
Evaporative Condensers

Table of Contents

OM VL_SA 01/11-01
Page
2
3
4
5
10
11
12
1

Advertisement

loading

Summary of Contents for BAC VTL

  • Page 1: Table Of Contents

    Table of Contents Page actions should be recorded in the cooling system logbook. Construction Details For more specific recommendations on keeping your cooling system efficient and safe, contact your local BAC General Information representative. Water Care Maintenance Procedures Comprehensive Maintenance Further Assistance &...
  • Page 2: Construction Details

    CONSTRUCTION DETAILS VTL Cooling Towers VFL Closed Circuit Cooling Towers - VCL Condensers 1. Casing 10. Coil 2. Water Distribution Section 3. High Efficiency Drift Eliminators 4. Fan 5. Fan shaft and bearing 6. Fan motor 7. Wet Deck Surface 8.
  • Page 3: General Information

    Connecting Pipework BAC cooling equipment is designed for the operating conditions All piping external to BAC cooling equipment must be supported specified below, which must not be exceeded during operation. separately. In case the equipment is installed on vibration rails or...
  • Page 4: Water Care

    WATER CARE About Water Care Passivation In all cooling equipment, operating in evaporative mode, the cooling Galvanised steel units require passivation in order to prevent white is accomplished by evaporating a small portion of the re-circulating rust. Passivation is the formation of a protective, passive, carbonate layer water as it flows through the equipment.
  • Page 5: Maintenance Procedures

    MAINTENANCE PROCEDURES The float controlling the make-up valve is mounted on a threaded Checks and Adjustments rod, held in place by wing nuts. (see figure below) COLD WATER BASIN AND BASIN STRAINERS The cold water basin should be inspected regularly. Any debris which may have accumulated in the basin or on the strainers should be removed.
  • Page 6 Unusual noise and/or vibration are the result of malfunctioning of mechanical components or operational problems. If this occurs, a thoroughful inspection of the entire unit followed by immediate corrective action is needed. If required, consult your local BAC Balticare representative for assistance. Inspections and Corrective Actions...
  • Page 7 Remove any obstructions from heat transfer section(s). Any damages or corroded areas need to be repaired. Call your local BAC Balticare representative for assistance. Minor fouling can usually be removed chemically or by temporary changes to the water treatment programme. Contact your water treatment supplier for advice.
  • Page 8 MAINTENANCE PROCEDURES Under normal operating conditions the bearings should be greased every 2000 operating hours or at least every six months. The bearings should be lubricated with one of the following water resistant inhibited greases, which are good for ambient temperature ranging from - 55°C to 120 °C.
  • Page 9 Consult your BAC Balticare representative for further information. Excessive levels of chlorine must be avoided as this quickly can lead to corrosion and damage to your system.
  • Page 10: Comprehensive Maintenance

    In emergency cases shipment can be usually made within 24 hours. To order factory authorized parts, contact your local BAC representative. Be sure you include the unit serial number when ordering any parts.
  • Page 11: Further Assistance & Information

    Balticare BAC has established a specialized independent total care company called Balticare . The BAC Balticare offering involves all elements required to ensure a safe and efficient operation of your evaporative cooling products. From a full range of risk assessment to selective water treatment, training, testing, record keeping and annual system overview.
  • Page 12: Recommended Maintenance And Monitoring Programme

    RECOMMENDED MAINTENANCE AND MONITORING PROGRAMME Schedule Every Six Type of Action Action Start-Up Weekly Monthly Quarterly Annually Shutdown Months Checks and Adjust- Cold Water Basin and Strainers ments Operating level and make-up Blow down Sump heater package Belt tension Drive alignment Locking Collar Rotation of fan(s) and pump(s) Motor voltage and current...
  • Page 13 NOTES...
  • Page 14 NOTES...
  • Page 15 NOTES...
  • Page 16 RECOMMENDED MAINTENANCE AND MONITORING PROGRAMME Model: ................... Serial number: ................. www.BaltimoreAircoil.com Baltimore Aircoil Comapy SA info@BaltimoreAircoil.co.za (Pty) Ltd Portland Road, Phillipi, Cape Town, South Africa © Baltimore Aircoil Company SA (Pty) Ltd.