MAINTENANCE INSTRUCTIONS
Baltimore Aircoil Company equipment needs to be
properly
installed,
Documentation of the equipment used, including a
drawing, technical data sheet and this manual should be
kept on record. To achieve long, trouble-free and safe
operation, it is necessary to establish an operating plan
including a programme of regular inspection, monitoring
and maintenance. All inspections, maintenance and
monitoring actions should be recorded in a cooling system
logbook. The operating and maintenance instructions
published here can be used as a guide to achieve these
goals.
In addition to establishing the operating plan and the
cooling system logbook it is recommended to conduct a
cooling system risk analysis, preferably by an independent
third party.
For the cooling system, scale, corrosion and biological
control must be established and initiated when the system
is first filled with water and administered on a regular
basis thereafter in accordance with recognized Codes of
Practice. Water sampling, test results and corrective
actions should be recorded in the cooling system logbook.
For more specific recommendations on keeping your
cooling system efficient and safe, contact your local BAC
representative.
VTL
VFL
VCL
operated
and
maintained.
OPERATING AND
Cooling Towers
Closed Circuit Cooling Towers
Evaporative Condensers
Table of Contents
OM VL_SA 01/11-01
Page
2
3
4
5
10
11
12
1