Galanz XQG90-T514VE Service Manual page 21

Automatic drum washing machine
Table of Contents

Advertisement

execute the automatic detection mode; if you turn the program knob, the program will execute the
manual detection mode. The specific process is as follows:
设定 Set up
C01 预洗阀测试
(P02 位置)
C01 pre washing valve
test
(P02 position)
C02 主洗阀测试
(P03 位置)
C02 main washing valve
test
(P03 position)
C03 软化阀测试
(P04 位置)
C03 softening valve test
(P04 position)
C04 热水阀测试
(P05 位置)
C04 hot water valve test
(P05 position)
C05 加热测试
(P06 位置)
C05 heating test
(P06 position)
C06 电机转动方向测试
(P07 位置)
C06 motor rotation
direction test
(P07 position)
C07 外筒泄漏测试
(P08 位置)
C07 outer cylinder
leakage test
(P08 position)
C08 排脱水测试
(P09 位置)
C08drain water test
(p09 position)
注:Note:
◆测试过程中,检测故障报警,如在当前阶段发生时,立即报警,并停止执行程序。
◆In the process of testing, detect the fault alarm, if it occurs in the current stage, immediately alarm
注水设定时间
Water injection setting time
注水设定时间
Water injection setting time
注水设定时间
Water injection setting time
注水设定时间
Water injection setting time
此功能预留
This function is reserved
判断水位是否已在 WL00 水位以上,如未到必须软化阀先补水至加
WL00 水位,然后开始加热,加热设定时间
Judge whether the water level is above WL00 level. If not, make up
water to WL00 level by softening valve, then start heating, set heating
time
正转设定时间
Forward rotation setting time
判断水位是否已在洗涤 1 水位,如未到必须先补水至洗涤 1 水位,反
转设定时间
Judge whether the water level is at the level of washing 1, if not,
make up water to the level of washing 1, and reverse the set time
先排水至空筒 0 水位以下,然后以最高速脱水(无须不平衡检测) ,加
速及高速过程持持续设定时间,关闭电机输出。
First drain water to the level below 0 of the empty cylinder, then
dehydrate at the highest speed (without imbalance detection), and
the motor output will be turned off when the acceleration and
high-speed process lasts for a set time.
XYJGT90100TVE-001
描述 Describe
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xqg100-t514veXqg90-t614veXqg100-t614ve

Table of Contents