NOTE
To maintain EMC certification, the ethernet cable should make 4 loops through the
supplied ferrite cable clamp. The clamp should remain on the outside of the Vertex Edge
System enclosure.
Vertex Edge System
The ferrite is supplied with the unit.
It is located behind the display and
mounted above the PDU.
44
User Manual