1/ Location; 2/ Connection; Circulator Control; Control Of The Thermostat Input Of The Boiler - DELTA DORE Pack TYBOX 5000 Installation Instructions Manual

Table of Contents

Advertisement

1/ Location

Since the temperature measurement sensor is inside the box, you must install the
thermostat flush-mounting box:
- on an accessible wall at a height of 1.50 m
- away from heat sources (fireplaces, sunlight) and draughts (windows, doors)
IMPORTANT: Do not install the thermostat on a wall in contact with the outdoors
or with an unheated room (e.g. garage, etc.) The sleeve output in the flush-
mounting box must be blanked off (with mastic) in order to avoid unwanted air
movements that could bias the sensor reading.
~1,50 m
Mini 20 cm
1
4
L
N
2
2A max. / 230V~
TYBOX 5000
L

2/ Connection

The diagrams provided are simplified for greater clarity. Protections and other
accessories required by standards are not illustrated. - Standard NF C15-100
and good practice must be complied with. Connected or nearby units must not
generate excessive interference (directive 89/336/EEC).
2.1 Circulator control
L
N
2.2 Control of the thermostat input of the boiler 
2A max. / 230V~
or heat pump (HP) no-reversible
Boiler
Thermostat
input
2A max. / 230V~
N
Circulator
2A max. / 230V~
TYBOX 5000
HP
Thermostat
input
2A max. / 230V~
EN
2A max. / 230V~
2A max. / 230V~
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

6050671

Table of Contents