3. Type the cfgadm command to verify that the component has been configured.
# cfgadm -a
The configured component is displayed as being configured.
The READY LED (green) of the HDD goes on.
4.3.4
Verifying the Hardware Operation
Confirm the status of the LED indicators.
■
For information on the LED status, see
4.4
Hot Replacement/Hot Addition
In hot replacement, the target FRU is operated while the domain to which the FRU
belongs is stopped.
Depending on the target FRU, there are two cases as follows:
Power supply unit/Fan unit: operated with XSCF commands.
■
Hard disk drive: operated directly, not by using XSCF commands.
■
For hot addition, do the same operation as that for hot replacement.
and
TABLE 2-3
TABLE 2-5
Chapter 4
FRU Replacement Preparation
.
4-7
Need help?
Do you have a question about the SPARC Series and is the answer not in the manual?