Battery Power-On and Commissioning
● For details about how to store and recharge a battery, see the
● Ensure that the charge process is supervised to prevent any abnormality.
● If a battery experiences an abnormality such as bulging or smoking, stop
● Ensure that only trained professionals perform recharge operations.
● When the battery SOC is 0%, the product cannot be activated by pressing and
● It is recommended that a battery be charged to 50% SOC during recharge.
Prerequisites
Power cables and signal cables are connected correctly.
Procedure
Step 1 Set the DC SWITCH to ON.
Step 2 Set the AC input switch to ON.
If there is no AC input or no PV module is configured, press the black start button
first.
Step 3 Observe the annular strip light. If all green lights are steady on, battery charging
completes.
Step 4 After battery charging completes, switch off the AC input switch and then the DC
SWITCH. If other batteries need to be charged, repeat the preceding steps.
----End

8.5 Exporting Logs from the App

Access the Maintenance screen, choose Data Download, and select the file to be
exported.
Issue 01 (2021-09-30)
NO TICE
Storage and Recharge
charging immediately and dispose of it.
holding the black start button. It can be started only after the solar energy and
AC power are connected.
Long-term storage will cause capacity loss. After lithium batteries are stored at
the recommended storage temperature for 12 months, the irreversible capacity
loss is 3% to 10%.
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
Guide.
8 System Maintenance
Lithium Battery
87

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map15a1Mab05b1

Table of Contents