Operation - probst AKZ-UNI-H Operating Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

Operation

6
Operation
The "open" and "close" functions are actuated by the valve control levers attached to the truck loading crane.
The "open" and "close" functions are performed as long as the valve control levers are actuated
The turning of the flange clamp with the turning motor must be carried out very carefully, otherwise the load may be
ejected
The valve control lever equipped with a spring return must not be moved to its zero position with a jerk, as this will
build up pressure surges in the hydraulic circuit which may reduce the clamping force of the unit!
The optimum holding or clamping force is obtained by holding the control lever in the closed position for two seconds
after closing the tongs
In order to achieve an even load on the tool, it must always be placed in the middle of the grab goods (stone packs)
When loading sensitive grab goods, the holding force of the device can be reduced by means of a pressure relief valve
Avoid jerky movements when the machine is loaded.
Carefully place the grab goods (building material packages) down again after transport
56100101
19 / 27
GB

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKZ-UNI-H and is the answer not in the manual?

Questions and answers

Table of Contents