Complete The Parts Replacement - Lenovo ThinkSystem SR250 V2 Maintenance Manual

Hide thumbs Also See for ThinkSystem SR250 V2:
Table of Contents

Advertisement

Figure 127. VGA cover installation
After you finish
1. Connect the VGA cable. See
2. Install the top cover onto the server. See
3. Complete the parts replacement. See

Complete the parts replacement

Use this information to complete the parts replacement.
To complete the parts replacement, do the following:
1. Ensure that all components have been reassembled correctly and that no tools or loose screws are left
inside your server.
2. Properly route and secure the cables in the server. Refer to the cable connecting and routing information
for each component.
3. If you have removed the server cover, reinstall it. See
4. Reconnect external cables and power cords to the server.
Attention: To avoid component damage, connect the power cords last.
5. Update the server configuration.
• Download and install the latest device drivers:
• Update the system firmware. See
• Update the UEFI configuration.
• Reconfigure the disk arrays if you have installed or removed a hot-swap drive or a RAID adapter. See
the Lenovo XClarity Provisioning Manager User Guide, which is available for download at:
datacentersupport.lenovo.com
ThinkSystem SR250 V2 Maintenance Manual
140
"Front panel cable routing" on page
"Install the top cover" on page
"Complete the parts replacement" on page
http://datacentersupport.lenovo.com
"Firmware updates" on page
35.
134.
"Install the top cover" on page
6.
140.
134.
http://

Advertisement

Table of Contents
loading

This manual is also suitable for:

7d7q7d7r

Table of Contents