Ferlux HIDROMATIC Manual page 33

Automatic pellet boiler
Table of Contents

Advertisement

Below we show the weekly schedule, which we will choose if what we need is a time slot of on and off for all days
of the week. That is, every day of
WEEKLY PROGRAMMING: The boiler can be programmed only once for all days of the week. With
three non-matching time slots for on and off, that is, three different non-matching time slots of turning on and
off the boiler for all days of the week.
A continuation shows the steps to follow to make the weekly programming of the boiler
the week will have the same operating hours of the boiler.
08:36 Jue 09 Sep 2021
º
33
º
º
º
the option of
º

Advertisement

Table of Contents
loading

Table of Contents