Pow-R-Line CS switchboards

Energizing switchboard

HAZARDOUS VOLTAGE WILL CAUSE SEVERE INJURY OR DEATH.
ONLY THOSE PROFESSIONALS TRAINED AND QUALIFIED ON
ELECTRICAL DISTRIBUTION SWITCHBOARDS SHOULD INSTALL AND/OR
SERVICE THIS EQUIPMENT.
Extreme hazards can exist when energizing electrical distribution
equipment and switchboards . Take all precautions necessary to
protect people and property when energizing the equipment . Short
circuits and ground faults may exist as a result from inadequate
installation . Short circuits and ground faults within the switchboard
can cause catastrophic damage, injury and death .
1. Prior to energizing the switchboard, turn OFF all over- current
devices and loads internal to the switchboard plus mains in
downstream equipment .
2. Verify and follow the sequence of energizing circuits and loads .
Verify phase sequencing on loads, such as motors, which can be
damaged or destroyed by incorrect phase connections .
3. If provided, use remote operators to close and energize
switchboard, overcurrent devices and loads .
4. Beginning with the main(s), turn ON each overcurrent device .
WARNING
WARNING
Instruction Manual IB015002EN

Maintenance

It is essential to maintain the equipment in satisfactory condition .
To ensure continued quality service, a systematic maintenance
schedule is vital . Facility operation and local conditions vary to such
an extent that the schedule must be prepared to suit the conditions .
The maintenance schedule for individual devices, such as circuit
breakers, meters, fusible switches, etc ., should be based upon
recommendations contained in the individual instruction leaflet for
each device . Inspection and test operations should be coordinated
with an overall testing program to result in the least operating
inconvenience and system shutdowns .
HAZARDOUS VOLTAGE WILL CAUSE SEVERE INJURY OR DEATH.
DE-ENERGIZE SWITCHBOARD PRIOR TO SERVICING.
ONLY THOSE PROFESSIONALS TRAINED AND QUALIFIED ON
ELECTRICAL DISTRIBUTION SWITCHBOARDS SHOULD INSTALL AND/OR
SERVICE THIS EQUIPMENT.
Prior to performing any maintenance on the switchboard, first
de-energize the switchboard at the source. Use lock-out/tag-out
precautions as prescribed in CEC and other safety manuals.
The switchboard should be given a thorough maintenance check
annually .
Exercise extreme care to prevent the equipment from being
connected to the power source while tests are being conducted.
EATON www.EatonCanada.ca/PRLCS
Effective November 2021
DANGER
WARNING
13

Advertisement

loading