Pump
Operation
Starting Systems:
1. Turn H-O-A switch to Off
position, then turn on main
circuit breakers.
2. Open all discharge valves
and al low water to rise in
sump pump.
3. Turn H-O-A switch to Hand
po si tion on one pump and
notice op er a tion. If pump is
noisy and vi brates, rotation
is wrong. To change rotation
interchange any two line leads
to motor. Do not in ter change
main in com ing lines. If duplex
sys tem, check second pump in
the same manner.
4. Now set both H-O-A switches
to Auto position and allow
water to rise in sump until
one pump starts. Allow pump
CONNECTION DIAGRAM FOR LEADS IN
MOTOR AND CONNECTION BOX
(Y) WYE MOTOR CONNECTIONS
230 VOLTS
6
5
4
9
8
7
3
2
1
GREEN
L1
L2
L3
to operate until level drops to
turn-off point.
5. Allow sump level to rise to
start other pump. Notice run
lights on panel; pumps should
alternate on each suc ces sive
cycle of op er a tion.
6. Turn both H-O-A switch es to
Auto position and allow sump
to fill to the over ride control
level.
7. Turn both switches to Auto
po si tion and both pumps
should
start
to geth er until level drops to
turn-off point.
8. Repeat this operation cycle
sev er al times before leav ing
the job.
9. Check voltage when pumps
are operating and check the
amp draw of each pump.
Check amps on each wire as
sometimes
will exist. One leg can be
some what higher (5 to 10%)
460 VOLTS
6
5
4
9
8
7
3
2
1
GREEN
L1
L2
L3
without caus ing trouble. For
excessive amp draw on one
leg, the power company should
be consulted.
Pump
Maintenance
As the motors are oil filled, no
lu bri ca tion or other main te nance
is required.
If a seal failure unit is used, no
and
operate
at ten tion is necessary as long
as the seal shows sat is fac to ry
operation.
If seal failure is not used, the
pump should be lifted once every
two years and the oil be drained
from the seal cham ber to check
for water.
If the pump is used on a Hydr-
O-Rail system, it should be
a
high
leg
lifted once every six months and
checked for cor ro sion and wear.
HEAT SENSORS AND SEAL FAILURE CONNECTIONS
FOR ANY VOLTAGE MOTOR
HEAT SENSORS
IN MOTOR
WINDINGS
BLACK
HEAT SENSORS
ELECTRODE
RED
DARK
WHITE
GREEN
SEAL FAILURE
5