c. Before connecting power General Installation to the control panel, make sure all control switches Information Instructions (e.g. H-O-A switch) and protective devices (e.g. Electrical Connections: Thank you for purchasing your breakers) are in the off Hydromatic HRS. To help ensure position.
Excessive operations tend to b. Check incoming power Start-up affect the trip curve of the voltage and control circuit breaker. voltage. Checklist 2. Check run light operation by c. Check overload relay to see running pump in Hand. if it is tripped. Reset relay 7.
Page 4
8. Capacitor Check. d. Dry out the junction box Panel (if furnished); moisture in a. Make sure the capacitors the junction box may tend Troubleshooting discharged. to cause relays to energize extreme caution; severe intermittently. shock hazard may exist removing any jumper or with capacitors.
Page 5
10. Motor voltage check: 11. Short cycling pump. Typical a. Check float controls. Motor Voltage Component Lead Mode Reading 12. Run light stays on. a. Selector switch may be in Main Winding Black to Start Line Voltage the Hand position. White Main Winding Black to...
Pentair Hydromatic will cover only the lower seal and labor thereof for all dual seal pumps. under no circumstance will Pentair Hydromatic be responsible for the cost of field labor, travel expenses, rented equipment, removal/reinstallation costs or freight expenses to and from the factory or an authorized Pentair Hydromatic service facility.