Fluke VIBGUARD compact Manual page 35

Table of Contents

Advertisement

Cable preparation
Remove length from the sensor cable and the shield cable according to the following figure:
l
Assembly
Place the solder sleeve over the sensor cable. The solder preform should be centered over the shield braid.
l
Insert the shield cable to be connected between the solder sleeve and the sensor cable. The shield cable
l
can be laid in the direction of the sensor cable or in the opposite direction (see illustration).
Fix the assembly in a suitable fixture.
l
Heat the solder preform using a heating tool.
l
The solder sleeve shrinks, the inner solder preform with flux melts and solders the shield braid to the shield
cable (a). At the same time, both ends of the solder sleeve are hermetically sealed. The shield connection is
thus reliably insulated and strain-relieved. The quality of the soldered connection can be inspected visually
via the transparent sleeve.
Coaxial cable
Clamping the signal lines
Terminals AI1 to AI6 are provided for vibration signals. Connect the rpm sensor to the tachometer pulse input TP1.
Connect a status signal to the digital input DI1. Connect the relay outputs SYS and NO to a digital input of an external
system
Observe the connection specifications in this regard (see
VIBGUARD compact
Dimensions in mm [inch]; valid for coaxial and
twisted-pair cables
Twisted-pair cable
"Technical data" on page
13).
Installation and Operation
35

Advertisement

Table of Contents
loading

Table of Contents