Zoeller 105-0010 Installation Instructions Manual page 5

Inlet / high head drain pump systems
Table of Contents

Advertisement

STEP 3
3.1) Assemble switch as shown in Figures 3.1 - 3.3.
3.2) Attach float to discharge pipe as shown in Figure 3.4.
1
LOCKING PIN MUST BE
INSTALLED UNDER FLOAT ROD
IN THIS LOCATION.
2
3
4
5
Figure 3.1
STEP 4
4.1) Install the foam gasket on to the "gasket surface" at the top of the basin, refer to Figure 4.1 for details.
FOAM GASKET
Installation of the Float Assembly (Model 135 Only)
ATTACH BRACKET TO SWITCH
USING THE SCREWS PROVIDED.
BOTTOM VIEW
SK2372
Figure 3.2
Installation of the Foam Gasket
© Copyright 2014 Zoeller Co. All rights reserved.
SLIDE FLOAT STOP
TO THE TOP OF
THE FLOAT ROD.
Figure 3.3
OVERLAP DETAIL
APPROXIMATELY 6 mm (1/4") OVERLAP
GASKET SURFACE
GASKET SEAL MUST BE
PLACED INSIDE OF HOLE
Figure 4.1
5
SK2370
Figure 3.4
GASKET SEAL DETAIL
FOAM GASKET
BASIN
SK2371
9 1/2
1/4
SK2368

Advertisement

Table of Contents
loading

This manual is also suitable for:

135-0005

Table of Contents